After the equipment installed and debugged by the debugging personnel can it be given to actual operating personnel to use.
本设备安装并由经调试人员调试后,方可交与实际操作人员开始使用。
Second, responsible for the equipment installation, debugging to produce qualified products, our company technical installation personnel evacuation party;
负责设备的安装调试到生产出合格产品后,我公司技术安装人员方撤离;
Eventually, the problems, solutions and the personnel experience in designing and debugging are summarized.
最后,总结出作者在系统设计调试时所遇到问题、解决措施和个人心得体会。
应用推荐